- Project Info:
- Vessel Name: “Gilavar”
- Vessel Type: Research/Survey Vessel
- IMO: 8008539
- Client: Caspian Geo LLC
- Duration: 08.06.2019 – 10.09.2019
- Principal Dimensions:
- Lenght: 84.97m
- Breadth: 15.63m
- DWT: 1400t
Scope of Work
- Cleaning and pumping disel oil from tank
- Cleaning and pumping from grey water tank
- Installation pipe grey water discharge to grey water tank
- Hull Shell Plates HP Wash / Scrapping / Blasting / Painting; Protection of propeller, anodes, chutes preparatin, anode, propeller, thruster, transducers, scupper plugs, fenders & portholes
- Hull Marking-Painting of Markings on Hull and Bulwark, Ships name on port and stbd bow, Name and port of registry on stern, Draft marks on port and stbd bow, midship and stern, Freeboard/plimsol mark on port and stbd midship, Bulbous bow marks on port and stbd bow, Thruster marks on port and stbd bow
- Port & Stbd Anchors and chains to be ranged out in drydock, cleaned, inspected, calibrated and marked with band its strap
- Kort nozzle pressure test @ 5 bar, HP 3,000psi washing, hard scrapped, grit blasting SA 1.5 and painting
- To remove cement and bottom plugs, Rudder HP 3,000psi washing, hard scrapped, grit blasting SA 1.5 and painting, Stern Roller HP 3,000psi washing, hard scrapped, grit blasting SA 1.5 and painting
- Rudder-Remove ruder to dock bottom for inspection, Renew rudder stock lip seal spares, Dismantling of Rudder stock from steering gear & overhauling
- Rope guard HP 3,000psi washing, hard scrapped, grit blasting SA 1.5 and painting
- Zinc anodes to remove and re-install with new zinc anodes
- Sea chest: hand scrap of barnacles, HP Water Jet Cleaning, Gritblast to SA1
- Remove sea chest grating, clean by HP Washing, blasting, painting, fit the gratings back into place and replace the seizing wires with new stainless steel wire
- Thruster grid to be removed / cleaned / sandblasted SA-1.0 and painting
- Dismantling of sea water strainers
- Sea valves to dismantle & overhaul, clean, free up, lap in for DNV GL Class inspection
- Replacement of corroded top plate of the BW tank; Helideck railing blasting/painting & reinstallation
- Tanks Hydro & Air Pressure test
- Replacement of steel plate as per UTM report Shelter deck, WBT #5, Shell plating PS, Helicopter deck
- Main mast repair
- Helideck & Bridge drain lines repair
- UT test & repair of the Cracked weld seam on shell plates
- Modification of Bracket for new VSAT antenna
- Chemical cleaning / water flushing of horizontal & Vertical fender
- Repair on V-SAT mast, Fabrication & Installation new pole for pull out mast
- Fabrication & Installation of new Benches for Gyrocompasses
- VESSEL PORTHOLES CORRODED FRAMES REPAIR
- REMOVING, FABRICATION AND INSTALLATION OF THE CORREDED/DEFECTED VENT. HEADS
- REPAIR OF THE DAMAGED FRC BOAT SHELL PLATES
- REPAIR / REPLACEMENT OF THE BWT No:5 DEFECTED DISCHARGE LINE
- SCRAPPING / HP WASHING / BLASTING / PAINTING OF THE AZIMUTH THRUSTER AMD AZIMUTH THRUSTER SEA CHEST BOX
- HP WASHING / BLASTING / PAINTING OF THE UNDER HELIDECK PS & STBS CONSOLES
- Fabrication / Machining of the 8 sets of bronze inserts for Streamer Winch clamps
- REPAIR OF STRAINER
- Replace pipelines to FW tank
- Replace fire pipeline on superstructure deck
- Repair shape's pole on monkey islend
- CORRECTION OF PLIMSOL MARKS ON PS & STBS SHELL PLATES AFLOAT
- SEISMIC PARTS UNLOADING/LOADING/STORAGE AND TARNSPORTATION
- Pressure test of seismic HP air system
- Chemical cleaning/flushing of HP air system an bottles
- Barovane system fabrication & installation as per provided drawing
- Hot Oil Flushing(NAS 6) and Testing of Barovane new installed tubing & pipeline
- Test pressure 375bar
- Installation lubrication pump and piping
- Hot oil flushing (NAS 6) and Testing of Lubricating oil pump tubings
- Test pressure 600bar
- Remove the ODIM Monowing hydraulic system on port/stbd gun deck
Maersk Explorer - Drilling Jack Up