- Project Info:
- Vessel Name: “Dada Gorgud”
- Vessel Type: Drilling Jack Up
- IMO: 8752099
- Client: Caspian Drilling Company Ltd.
- Duration: 28.03.2015 – 30.06.2015
- Principal Dimensions:
- Lenght: 79.3m
- Breadth: 61m
Scope of Work
- Cutting out equipment seating in ME room
- Cutting of watertight door in ME room
- Fabrication and installation of new bulkhead for SCR room
- Removal of cable ladders in old Emergency generator room
- Removal of 9 pcs panama chock, installation of 9 pcs panama chock, fabrication of 9 pcs panama box
- Dismantling and removal of 2 pcs AC from Engine room
- Disconnect Engine and Alternator separate part of Emergency generator
- Fabrication and installation on top of generator room
- Fabrication and installation of windows plate in SCR room
- Modification of pillars in ER
- Removal of cable ladders in engine room
- Cutting of platform on top of SCR room
- Removal fuel oil line drain system
- Installation of Elevator
- Bus Services
- Welding of anchor points for engine sliding preparation of air cylinder temporary foundation
- Installation of new generator foundation in Engine Room
- Fabrication and installation of air inlet, air outlet, air intake in SCR and pipe deck as per drawings
- Fabrication and installation of transformer foundation in transformer room
- Fabrication and assembly of new emergency generator room and chiller room as per drawing
- Fabrication of fuel oil tank as per drawing
- Fabrication of new generator foundation in Enginee Room as per drawing
- Fabrication and installation of new switchboard foundation