ZARIFA ALIYEVA
Ro-ro passenger ferry designed for railway wagons, motor trucks, dangerous goods, passengers, and Caspian Sea operations.
Technical parameters
Principal Dimensions
General
- Yard Number
- H109
- Owner
- ASCO
- Delivery Date
- 2022
Accommodation
- Crew
- 30 person
- Passengers
- 100 person
- Total capacity
- 130 person
Equipment
- Main Engines
- 2 x 2600 kW
- Helideck
- 18 x 18.2 m
- Fin Stabilizer
- 7.48 m2
- Cargo Lift
- 24.73 x 8.6 m
Dimension
- Length O.A
- 154.50 m
- Beam MLD
- 17.70 m
- Depth MLD
- 7.50 m
- Draught
- 4.50 m
- Vessel Speed
- 14 knot
Basic Functions: Transportation of 56 railway wagons with 1520 mm track breadth and motor trucks, Passenger, vehicle, and dangerous goods carriage, Aft cargo handling and side ramp vehicle loading, Helideck operations according to ICAO requirements, Cargo lift operation for rail trucks up to 188 tons.

Overview
Project execution
The new ferry vessel is assigned for transportation of 56 railway wagons with 1520 mm track breadth and motor trucks, including 50 car trains, dangerous goods, and passengers. The ferryboat construction foresees an aft cargo handling scheme and is equipped with a side ramp for loading and unloading vehicles from and to a usual berth.
The place for helicopter landing is equipped according to ICAO requirements. Overall dimensions of the helideck are D=18 x 18.2 m. The final approach and take-off area, touch down and lifting area are equal to overall dimensions D=16 m. Maximum weight of landing helicopter is 11 t.
The helideck is protected by a low-expansion foam fire extinguishing system. The helideck monitoring system includes visibility distance sensor, cloud border height sensor, air temperature, humidity and pressure sensor, wind speed and direction sensor, and wind cone.
Retractable fin stabilizers for stabilization underway, with fin area up to 7.48 m2, are installed in the area of bulge Fr.92-103 on starboard and port side.
The cargo lift platform has total length of 24.73 m and total breadth of 8.6 m. Safe working load of the cargo lift is two rail trucks of 94 tons each, total 188 tons, with axle load of 12 tons on four wheels or 10 tons on two wheels.
Hoisting and lowering operations are performed by four jigger winches via pre-stretched wire ropes. Hydraulic operated locking devices are provided at the longitudinal ends of the lift platform for cargo loading and unloading.
Four guide pillars and guide pieces are installed for lifting and lowering operations at harbor condition. Vehicle stopper devices are installed on deck No.1 and No.3 and operated by hydraulic cylinder. Theoretical maneuvering time of lifting or lowering with loaded vehicles on the lift platform is about three minutes.
The cargo lift system is equipped with a waterproof cover. Safe working load of the lift cover is two rail trucks of 94 tons each, total 188 tons, with axle load of 12 tons on four wheels or 10 tons on two wheels.
Operations
Core operational capability
Transportation of 56 railway wagons with 1520 mm track breadth and motor trucks
Passenger, vehicle, and dangerous goods carriage
Aft cargo handling and side ramp vehicle loading
Helideck operations according to ICAO requirements
Cargo lift operation for rail trucks up to 188 tons
Timeline
Milestone control
Each stage is organized around production readiness, quality records, and yard coordination.
Stage 01
Engineering and planning
Design, production planning, class deliverables, procurement and work packages were aligned for ferry construction.
Stage 02
Construction and outfitting
Hull construction, cargo systems, helideck, vehicle handling equipment, outfitting and system integration were completed through yard workflows.
Stage 03
Testing and commissioning
Commissioning, acceptance, documentation and handover activities supported the vessel's entry into operation.
Video
Construction timelapse
Gallery
Yard views
Construction
Construction stages
Commissioning ceremony
President Ilham Aliyev attended the commissioning ceremony
Related projects
Crude Oil and Chemical Liquids Tanker
ZANGILAN
Self-propelled crude oil and chemical liquids tanker designed for petroleum products, two-cargo operation, and Caspian class requirements.
Floating Dry Dock
"28 May" - Floating Dock
"28 May" Floating Dry Dock is a 168 m x 50 m dock capable of lifting and accommodating vessels up to 25,000 t displacement.