"28 May" - Floating Dock

"28 May" Floating Dry Dock is a 168 m x 50 m dock capable of lifting and accommodating vessels up to 25,000 t displacement.

Technical parameters

Principal Dimensions

Dimensions

Length along with Pontoon Deck
168.38 m
Breadth Pontoon (external sides)
50 m
Breadth Pontoon (inside)
40 m
Maximum submerging draught
15.5 m
Lifting capacity at docking
25,000 t
Lifting capacity at transfer
18,000 t
Maximum operational wind speed
26 m/sec

Basic Functions: Lift ships out of water for repair inside the dock, Transfer ships to the quay side transfer area of the shipyard, Launch new build vessels.

Length

168 m

Floating dry dock

Breadth

50 m

External sides

Docking

25,000 t

Lifting capacity

Transfer

18,000 t

TTS interface

Overview

Project execution

"28 May" Floating Dry Dock (FDD), measuring 168 m x 50 m, is capable of lifting and accommodating vessels of maximum 25,000 t displacement.

The maximum vessel breadth it can accommodate is 34 m, with maximum drafts not exceeding 7.0 m. The dock is equipped with two 20 t cranes on the top deck.

The dock is intended to lift ships out of the water and to transfer ships to the transfer area of the shipyard and vice versa. 20 t dock cranes and the 300 t gantry crane with electric drives move along rail tracks, supported by the automatic panel line and trolley transfer system.

The dock is a floating type, single pontoon, two-wing wall, steel structured, non-propelled unit, non-autonomous with regard to power supply and directly connected to shore.

The dock performs the following main functions: lifting ships out of water for repair inside the dock, lifting ships out of water and transferring them to the quay side transfer area of the shipyard, and launching new build vessels.

Technically, the dock is completely new, with an expected lifetime of around 50 years.

Operations

Core operational capability

Lift ships out of water for repair inside the dock

Transfer ships to the quay side transfer area of the shipyard

Launch new build vessels

Timeline

Milestone control

Each stage is organized around production readiness, quality records, and yard coordination.

1

Stage 01

Design and construction

The floating dock was built as a major yard capability for shipbuilding, repair, transfer and launching activities.

2

Stage 02

Docking and transfer integration

Dock cranes, rail tracks, gantry crane interface and the trolley transfer system were aligned for integrated yard operations.

3

Stage 03

Operational readiness

The dock entered service to support repair docking, transfer to the yard repair area, and launching of new build vessels.