HEYDAR ALIYEV
Pontoon and upper block fabrication scope for the HEYDAR ALIYEV semisubmersible drilling rig.
Technical parameters
Principal Dimensions
Principal Dimensions
- Breadth outside pontoon
- 50 m
- Pontoon length
- 50 m
- Pontoon breadth
- 18 m
- Column length
- 50 m
- Column breadth
- 16.5 m
- Dimensions of main deck
- 69.50 x 69.50 m
- Depth to main deck
- 35.50 m
- Depth to tween deck
- 35.50 m
- Depth to lower deck
- 29.10 m
- Frame spacing
- 500 mm
- Operation draught (Max)
- 20.50 m
- Operation draught (Min)
- 18.50 m
- Transit draught
- 8.80 m
Basic Functions: Fabrication of pontoons and upper blocks, Heavy steelwork for semisubmersible drilling rig construction, Outfitting integration support, Support for DSS 38M drilling rig construction, Pontoon fabrication with approximately 2,200 tons weight each.
Overview
Project execution
The semi-submersible drilling rig was awarded by Caspian Drilling Company to two subsidiaries of Keppel Offshore & Marine Company with Caspian Rigbuilders and Caspian Shipyard Company.
Caspian Shipyard Company signed a contract with Baku Shipyard LLC for undertaking fabrication of the pontoons and upper blocks for the construction of a semisubmersible drilling rig. Each pontoon's weight is about 2,200 tons; overall steelwork performed together with upper hull blocks and outfittings is about 5,800 tons.
The DSS 38M rig is designed for a drilling depth of up to 40,000 ft and operations in 1,000 m water depth. To withstand high wind speeds in the Caspian Sea, an 800 m self-contained eight-point mooring system was installed.
Equipped with well control piping, BOP handling, and foundations rated for 20,000 PSI, the DSS 38M is among the first shallow water semisubmersibles with the capability to perform drilling in expanded areas of operation in the oil fields of Azerbaijan.
The semisubmersible drilling rig, named after Heydar Aliyev, became the first and the only drilling rig in the world with 1,400 atmosphere system technology. Its carrying capacity is 5,600 tons and displacement is 47,500 tons.
Operations
Core operational capability
Fabrication of pontoons and upper blocks
Heavy steelwork for semisubmersible drilling rig construction
Outfitting integration support
Support for DSS 38M drilling rig construction
Pontoon fabrication with approximately 2,200 tons weight each
Timeline
Milestone control
Each stage is organized around production readiness, quality records, and yard coordination.
Stage 01
Contract and preparation
Caspian Shipyard Company contracted Baku Shipyard for pontoon and upper block fabrication scope.
Stage 02
Pontoon fabrication
Heavy steel pontoons and upper hull blocks were fabricated as part of the semisubmersible drilling rig construction program.
Stage 03
Outfitting support
Steelwork and outfitting integration supported the completion of the HEYDAR ALIYEV drilling rig.
Construction
Construction stages
Related projects
Crude Oil and Chemical Liquids Tanker
ZANGILAN
Self-propelled crude oil and chemical liquids tanker designed for petroleum products, two-cargo operation, and Caspian class requirements.
Floating Dry Dock
"28 May" - Floating Dock
"28 May" Floating Dry Dock is a 168 m x 50 m dock capable of lifting and accommodating vessels up to 25,000 t displacement.