Seabed Supporter
Deck reinforcement, seafastening and support installation works for the construction support vessel Seabed Supporter.
Project Info
Vessel information
- Vessel Name
- Seabed Supporter
- Vessel Type
- Construction Support Vessel
- IMO
- 9671632
- Client
- Swire Pacific Offshore (Caspian) LLC
- Duration
- 11.11.2015 - 17.11.2015
- Service
- Repairs and Conversions
Technical parameters
Principal Dimensions
Principal Dimensions
- Length
- 89.85m
- Breadth
- 16.5m
- DWT
- 2000t
Overview
Project execution
The Seabed Supporter repair scope covered deck welding and reinforcement works, including doubler plates, davits, winch seafastening assemblies, snatch blocks, hang-off assemblies, container seafastening, side shell doubler plates, D-rings and stainless steel side shell plates.
Scope of Work
Repair scope
- Welding of two upper assembly doubler plates to deck on port and starboard sides
- Welding of two davits to deck on port and starboard sides
- Welding of two winch seafastening assemblies on port and starboard sides
- Welding of two snatch blocks to deck T-bars
- Welding of two hang-off assemblies to main deck
- MPI testing on two main deck assembly doubler plates
- Welding of 20 ft container seafastening in new location
- Installation and welding of doubler plate to side shell
- Installation and welding of additional D-rings to main deck
- Welding of stainless steel plate on side shell PS / STBD
Timeline
Milestone control
Each stage is organized around production readiness, quality records, and yard coordination.
- 1
Stage 01
Deck preparation
Deck areas were prepared for doubler plates, davits, winch seafastening and lifting support installations.
- 2
Stage 02
Welding and reinforcement
Deck fittings, hang-off assemblies, D-rings, side shell doubler plate and stainless steel plates were welded in place.
- 3
Stage 03
Inspection and close-out
MPI testing and final close-out activities confirmed the completed deck reinforcement scope.
Related projects