Seabed Supporter

Deck reinforcement, seafastening and support installation works for the construction support vessel Seabed Supporter.

Project Info

Vessel information

Vessel Name
Seabed Supporter
Vessel Type
Construction Support Vessel
IMO
9671632
Client
Swire Pacific Offshore (Caspian) LLC
Duration
11.11.2015 - 17.11.2015
Service
Repairs and Conversions

Technical parameters

Principal Dimensions

Principal Dimensions

Length
89.85m
Breadth
16.5m
DWT
2000t

Asset

CSV

Construction support vessel

Length

89.85m

Principal dimension

DWT

2000t

Deadweight

Client

Swire

Pacific Offshore

Overview

Project execution

The Seabed Supporter repair scope covered deck welding and reinforcement works, including doubler plates, davits, winch seafastening assemblies, snatch blocks, hang-off assemblies, container seafastening, side shell doubler plates, D-rings and stainless steel side shell plates.

Scope of Work

Repair scope

  • Welding of two upper assembly doubler plates to deck on port and starboard sides
  • Welding of two davits to deck on port and starboard sides
  • Welding of two winch seafastening assemblies on port and starboard sides
  • Welding of two snatch blocks to deck T-bars
  • Welding of two hang-off assemblies to main deck
  • MPI testing on two main deck assembly doubler plates
  • Welding of 20 ft container seafastening in new location
  • Installation and welding of doubler plate to side shell
  • Installation and welding of additional D-rings to main deck
  • Welding of stainless steel plate on side shell PS / STBD

Timeline

Milestone control

Each stage is organized around production readiness, quality records, and yard coordination.

1

Stage 01

Deck preparation

Deck areas were prepared for doubler plates, davits, winch seafastening and lifting support installations.

2

Stage 02

Welding and reinforcement

Deck fittings, hang-off assemblies, D-rings, side shell doubler plate and stainless steel plates were welded in place.

3

Stage 03

Inspection and close-out

MPI testing and final close-out activities confirmed the completed deck reinforcement scope.