Maersk Explorer

Structural, mechanical, electrical, coating and life boat support works for the Maersk Explorer drilling jack-up.

Project Info

Vessel information

Vessel Name
Maersk Explorer
Vessel Type
Drilling Jack Up
IMO
8765565
Client
MAERSK DRILLING A/S Branch Azerbaijan
Duration
11.02.2019 - 04.04.2019
Service
Repairs and Conversions

Technical parameters

Principal Dimensions

Principal Dimensions

Length
104.34m
Breadth
64.5m

Asset

Jack-up

Drilling unit

Length

104.34m

Principal dimension

Breadth

64.5m

Principal dimension

Client

Maersk

Drilling A/S

Overview

Project execution

The Maersk Explorer project included fabrication and installation works, fender removal, elevator and window replacement, top drive offloading and preservation, deck reinforcement, starting air and drain pipe installation, coating works, mud agitation system piping, hydrotesting, HVAC ducting, life boat cradle fabrication and life boat handling activities.

Scope of Work

Repair scope

  • Fabrication and installation of anode box
  • Column fender removal
  • Installation of elevator
  • Replacement of windows
  • Top drive offloading and storage
  • Top drive equipment preservation
  • Sea chest blind repair
  • Reinforcement of AGR deck for installation of IKM equipment
  • Installation of starting air system
  • Drain pipe installation
  • Painting of side shells on four sides
  • Painting of aft life boat
  • Painting of moon pool
  • Painting of forward passageway
  • Painting of STBD and PS burner boom platforms
  • Painting top of helideck
  • Fabrication and installation of mud agitation system pipes and supports
  • Hydrotesting of new line
  • Painting of pipes, supports and burn marks caused by the job, scaffolding, lifting activities and tank ventilation for access and working purposes
  • Shut-off damper installation, actuator and controller upgrade
  • New ducting installation for chiller unit to drill cabin
  • Column scraping and painting
  • High pressure washing and cosmetic spray painting below waterline and red area
  • Fabrication of four life boat cradles, lifting of four life boats and one FRC from sea to designated area
  • Life boat polishing
Maersk Explorer drilling jack-up at Baku Shipyard

Timeline

Milestone control

Each stage is organized around production readiness, quality records, and yard coordination.

1

Stage 01

Preparation and fabrication

Anode box, life boat cradle, piping support and deck reinforcement works were fabricated and installed.

2

Stage 02

Systems and equipment

Top drive handling, elevator installation, air, drain, HVAC ducting, mud agitation and control system upgrade works were completed.

3

Stage 03

Coating and close-out

Coating, high pressure washing, life boat handling, polishing and final repair support works were completed.

Service portfolio

Explore more Repairs and Conversions

Back to service