CMS Shah

Hull treatment, tank cleaning, steel renewal, piping and electrical works for the general cargo vessel CMS Shah.

Project Info

Vessel information

Vessel Name
CMS Shah
Vessel Type
General Cargo
IMO
9111541
Client
Caspian Marine Services Ltd.
Duration
07.01.2015 - 14.02.2015
Service
Repairs and Conversions

Technical parameters

Principal Dimensions

Principal Dimensions

Length
81.6m
Breadth
11.3m
DWT
2030t

Asset

Cargo

General cargo vessel

Length

81.6m

Principal dimension

DWT

2030t

Deadweight

Client

CMS

Caspian Marine Services

Overview

Project execution

The CMS Shah repair project covered underwater hull cleaning and spot blasting, sea chest works, anode replacement, bow thruster grating works, anchor chain handling, ballast tank cleaning, steel renewal, piping modification and electrical works for steering gear, fire alarm, control cables and air-conditioning cooling systems.

Scope of Work

Repair scope

  • Hull scraping of marine growth, damaged coating and scale
  • Cleaning underwater hull by high pressure water washing machine
  • Spot blasting of underwater hull areas
  • Sea chest and sea chest grating blasting, cleaning and painting
  • Replacement of anodes
  • Bow thruster grating removal, blasting, painting and installation
  • Port and starboard anchors and anchor chains lowered and ranged in dry dock
  • High pressure washing, blasting and calibration of chain cables
  • Cleaning ballast water tanks
  • Fabrication and installation of new manhole cover for ballast water tank
  • Replacement of longitudinal bulkhead and stiffeners in water ballast tank
  • Replacement of starboard shell plate
  • Replacement of fore peak tank
  • Fabrication and installation of Plimsoll marks PS / STBD
  • Modification of ballast system inside WB aft peak tank No. 8 PS / STBD and hydraulic pipes
  • Electrical works on steering gear hydraulic power pack motors and control cables
  • Fire alarm call point cables
  • Steering gear feedback cables and control cables
  • Cable trays with cables and associated works
  • Air-conditioning seawater cooling pump starter panel with cables

Timeline

Milestone control

Each stage is organized around production readiness, quality records, and yard coordination.

1

Stage 01

Hull cleaning and docking works

The vessel hull, sea chest, anchors and chain cables were cleaned, blasted and prepared for repair and coating works.

2

Stage 02

Steel and tank works

Ballast tanks, manhole covers, bulkheads, stiffeners, shell plate, fore peak tank and Plimsoll marks were repaired or renewed.

3

Stage 03

Piping and electrical works

Ballast, hydraulic, steering gear, fire alarm, feedback control and air-conditioning cooling systems were modified or reinstated.