Barys

Dry-docking, structural reassembly, testing, systems reinstatement and coating works for the deck cargo ship Barys.

Project Info

Vessel information

Vessel Name
Barys
Vessel Type
Deck Cargo Ship
IMO
9814521
Client
Bue Bulkers Limited
Duration
02.11.2017 - 10.03.2018 (06.04.2018)
Service
Repairs and Conversions

Technical parameters

Principal Dimensions

Principal Dimensions

Length
113m
Breadth
21m
DWT
6400t

Asset

DCS

Deck cargo ship

Length

113m

Principal dimension

DWT

6400t

Deadweight

Client

Bue Bulkers

Repair scope

Overview

Project execution

The Barys repair project included dry-docking, transfer to repair slab, structural reassembly, NDT and tank tightness testing, equipment reinstatement, hydraulic and electrical works, ballast piping installation and final coating activities. The scope was delivered for Bue Bulkers Limited between November 2017 and April 2018.

Scope of Work

Repair scope

  • Dry-docking/undocking of the vessel inclusive arrangement of the tug boats
  • HP washing of the main hull underwater areas on vessel arrival
  • Transferring of the vessel to repair slab
  • Cutting and removing of transporting grillages, sea-fastening, temporary handrails, bumpers, blanking plates and unloading of cut off units
  • Alignment of the deformation on cutting lines
  • Welding of the cut units to the main hull
  • Re-installation of draft marks and permanent hull markings after assembly
  • NDT testing of the welds as per Class requirement
  • Tank tightness test of the reassembled tanks (air test)
  • Steel works for relocation of six 2x25 t bollards
  • Re-installation of life boats, davits and motors
  • Assembling of hydraulic system
  • Electrical works for installation of life boats, davits and motors according to supplier technical documentation
  • Assistance on life boat davit electrical test and hydraulic system test
  • Installation of dismantled equipment on reassembled wing tanks area
  • Installation of ballast system pipes and alignment of seachest fixed pipes on reassembled wing tanks area
  • Power tooling, blasting where necessary, touch-up painting and cosmetic coating of external hull with yard supplied paint material
Barys deck cargo ship at Baku Shipyard

Timeline

Milestone control

Each stage is organized around production readiness, quality records, and yard coordination.

1

Stage 01

Docking and preparation

The vessel was dry-docked, washed, transferred to the repair slab and prepared for structural reassembly.

2

Stage 02

Structural and systems works

Cut units were aligned and welded, tanks were tested, bollards relocated, and hydraulic, electrical and ballast systems were reinstated.

3

Stage 03

Testing and coating

Class-required NDT, tightness testing, equipment checks, touch-up painting and cosmetic hull coating supported final close-out.