Facility

Floating Dock & TTS

Three floating docks — the 28 MAY dry dock and the newly delivered YUSIF IBRAHIMOV and DOCK No. 953 — and the transfer trolley system support vessel lifting, repair slab transfer, and new build launching.

Floating docks

3

Docking capacity

25,000t

Transfer capacity

18,000t

KHANKENDI on the 28 MAY floating dry dock, aerial view

Overview

Facility description

"28 MAY" Floating Dry Dock (FDD), measuring 168m x 50m, is capable of lifting and accommodating vessels with maximum 25,000t displacement.

The maximum vessel breadth that can be accommodated is 34m, with maximum drafts not exceeding 7.0m. Cranes on the top deck provide 2 x 20t lifting support.

The dock is intended to lift ships out of the water and transfer ships to the Transfer Area of the Shipyard and vice versa. 20t dock cranes and the 300t gantry crane with electric drives move along rail tracks, supported by automatic panel line and trolley transfer systems.

The dock is a floating type, single pontoon, two-wing wall, steel structured, non-propelled and non-autonomous unit with direct shore power connection. Technically, the dock is completely new, with an expected lifetime of around 50 years.

The TTS trolley transfers vessels from the Floating Dock to the Repair Slab for further repair, with maximum lifting and transfer capacity for vessels of 18,000t displacement. It can determine accurate vessel weight and COG values including LCG and TCG, supporting ballast calculations before launching.

The TTS-Transfer Trolley System provides accurate weighing and center of gravity data for vessels, pontoons and barges. This gives the yard a wider range of operational possibilities, including calculation of the exact ballast quantity required before launching a vessel.

Two newly delivered floating docks add docking capacity: "YUSIF IBRAHIMOV" (144m x 81.4m, 15,000t docking capacity, 2 x 5t dock cranes) and "DOCK No. 953" (139m x 30.2m, 5,000t docking capacity, 2 x 5t dock cranes).

Main functions

What the dock performs

Lift ships out of water for repair inside the dock.

Lift ships out of water and transfer them to the quay side Transfer Area of the shipyard.

Launch new build vessels.

Equipment

Technical equipment

28 MAY Floating Dry Dock view

28 MAY Floating Dry Dock

Floating dry dock for lifting vessels out of water, repair inside the dock, transfer to yard areas and launch of new builds.

Length along Pontoon Deck
168.38m
Breadth external sides
50.0m
Breadth inside
40.0m
Maximum vessel breadth
34m
Maximum vessel draft
7.0m
Maximum submerging draught
15.5m
Docking capacity
25,000t
Top deck cranes
2 x 20t
Operational wind speed
26 m/sec
Expected lifetime
Around 50 years
TTS Transfer Trolley System view

TTS Transfer Trolley System

Transfer trolley system for moving vessels from the floating dock to the repair slab and determining accurate vessel weight and COG.

Transfer capacity
18,000t
Transfer route
Floating Dock to Repair Slab
Supported assets
Vessels, pontoons, barges
Measurement
Weight and COG
COG values
LCG and TCG
Operational use
Ballast calculation before launch

YUSIF IBRAHIMOV Floating Dock

Newly delivered floating dock adding docking capacity for ship repair and new build works.

Dimensions
144m x 81.4m
Docking capacity
15,000t
Dock cranes
2 x 5t
Status
Newly delivered

DOCK No. 953 Floating Dock

Newly delivered floating dock adding docking capacity for smaller vessels.

Dimensions
139m x 30.2m
Docking capacity
5,000t
Dock cranes
2 x 5t
Status
Newly delivered

Gallery

Facility views

Facilities

Explore more yard infrastructure